SuDS Pond LabMAP · MODEL · COMPARE
Loading SWMM
INTERACTIVE TEACHING WORKSPACE

What changes when you add a pond?

Draw a catchment. Run the storm. Use the evidence to defend your design.

01 / STUDY AREA

Build your drainage scenario

Peterborough · prepared exampleReplace either outline by drawing a new polygon.
CatchmentPond◎ Comparison outlet
Use the classroom example or import a project for a keyboard-accessible alternative to map drawing.
AFTER THE POND FILLS

Where does the excess water go?

Route surface flooding over real terrain. Explore a hypothetical pond on a prepared Peterborough domain.

2-D · 5 m

Street example: Hope Close / Aldermans Drive, Peterborough. Assumed pond and storm on real terrain.

Prepared 1 km terrain domain · real LiDAR and OSM features · assumed pond and release point

Release location: place it just outside the pond, inside the terrain domain.

Start with Load overflow example, or run your own pond and load the terrain.
One-way teaching model. No sewer capture, return flow to pond or observed-flow validation.
02 / MODEL EVIDENCE

Compare the hydrographs

The same storm. The same catchment. One pond to test.

Without pondWith pond
∿
Your first hydrograph starts hereUse the prepared catchment or draw your own,
then select Run without pond.
Ready to explore. The example geometry is loaded; results are calculated when you run it.
Peak discharge— % lowerCompare both scenarios
Peak timing— minChange in peak time
Peak pond depth— mCheck against capacity
Peak storage— m³Storage used during the storm
EPA SWMM 5.2.2 · 1-minute report interval
↗
PREDICT · TEST · EXPLAIN

Would you keep this design?

Change one pond parameter. Compare the peak, timing, storage and overflow. Explain your decision using the evidence.

Capture your decisionYour note is included when you save the project.
SUDS POND LAB

How it works